Shifter: Adrian Helmling-Cornell
Fellows: Ethan, Vlad
Some highlights for the first week-long DQ shift of O3b:
- Total observing time: 83.21% of the week
- Initial air compressor isolation not very effective
- Large 36 Hz peaks in daily strain
- Problems with the squeezer's coherent locking field (CLF) settings led to long stretches of decreased range, accompanied by a large rise in low-SNR, high frequency glitches
- Resolved this weekend
- Caused glitching in ETMX ESD voltage chassis sometimes, but not always
- May follow up by looking at glitching in PEM EX rack thta we have been seeing for a few months now
- Later half of the week featured lots of higher-SNR glitching in 15-40 Hz range
Full report here