TITLE: 11/13 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC STATE of H1: Lock Acquisition INCOMING OPERATOR: TJ SHIFT SUMMARY: Camilla, Patrick. TCS Y tripped off and had to be restarted on the floor. Wind fence installation continues after end of maintenance. Currently relocking. LOG: 16:00 UTC Vanessa to end X 16:01 UTC Tyler, Chris, Gavin to HAM6 to dismantle scaffolding 16:07 UTC Chandra to LVEA WP 8460 16:09 UTC Jeff B. to end, corner mechanical rooms 16:09 UTC Karen to end Y 16:12 UTC Charge measurements started at end X 16:13 UTC Charge measurements started at end Y 16:29 UTC Sudarshan starting WP 8464 16:30 UTC Ken to end Y electronics bay 16:34 UTC Richard and Filiberto replacing 35.5 MHz RF oscillator source 16:46 UTC Jim to HAM5,6 to lock HEPI 16:48 UTC Karen done at end Y 16:51 UTC Richard and Filiberto done 16:52 UTC Filiberto pulling cable over HAM6 for RGA 17:14 UTC Marc to HAM6, CER, WP 8465 17:18 UTC Jim done 17:19 UTC Jason and Timesh to end X for NCAL 17:23 UTC Charge measurements are done 17:27 UTC Karen to LVEA 17:31 UTC Timesh entering end X VEA 17:33 UTC Richard to end Y 17:39 UTC Ken into end Y VEA 17:40 UTC Jeff B. done 17:47 UTC Vanessa to LVEA 17:54 UTC Gavin back, scaffolding is removed 17:58 UTC Jeff B. moving chemicals into optics lab 17:58 UTC Gerardo back 18:00 UTC Tyler back 18:08 UTC Gerardo removing old RGA computer from LVEA 18:16 UTC Jeff B. done in optics lab 18:22 UTC Gerardo done 18:31 UTC Dave restarting CAL models 18:35 UTC Tyler using tractor to remove tumbleweeds around H2 building 18:35 UTC DAQ restart 18:40 UTC Richard back 18:52 UTC Gerardo to LVEA 19:03 UTC Jim unlocking HAM5,6 HEPI 19:06 UTC Jason back 19:07 UTC Marc done 19:23 UTC Jim done 19:24 UTC Richard and Arnaud to LVEA to look at temperature sensors 19:37 UTC Richard and Arnaud back 20:10 UTC Gerardo and Betsy back 20:15 UTC Relocking, Timesh is still at end X 20:39 UTC Filiberto and Timesh done 20:42 UTC Jeff and Hugh to end X to look at wind fence install activity 20:47 UTC Filiberto and Timesh back 21:21 UTC Jeff and Hugh back 22:12 UTC Vlad to optics lab 22:15 UTC Jason to optics lab 22:20 UTC Jason done 23:13 UTC Hugh to end X to check on wind fence install activity 23:47 UTC Timesh to end X 00:04 UTC Timesh leaving end X