Reports until 16:20, Tuesday 12 November 2019
LHO General
patrick.thomas@LIGO.ORG - posted 16:20, Tuesday 12 November 2019 (53207)
Ops Day Shift Summary
TITLE: 11/13 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Lock Acquisition
INCOMING OPERATOR: TJ
SHIFT SUMMARY: Camilla, Patrick. TCS Y tripped off and had to be restarted on the floor. Wind fence installation continues after end of maintenance. Currently relocking.
LOG:

16:00 UTC Vanessa to end X
16:01 UTC Tyler, Chris, Gavin to HAM6 to dismantle scaffolding
16:07 UTC Chandra to LVEA WP 8460
16:09 UTC Jeff B. to end, corner mechanical rooms
16:09 UTC Karen to end Y
16:12 UTC Charge measurements started at end X
16:13 UTC Charge measurements started at end Y
16:29 UTC Sudarshan starting WP 8464
16:30 UTC Ken to end Y electronics bay
16:34 UTC Richard and Filiberto replacing 35.5 MHz RF oscillator source
16:46 UTC Jim to HAM5,6 to lock HEPI
16:48 UTC Karen done at end Y
16:51 UTC Richard and Filiberto done
16:52 UTC Filiberto pulling cable over HAM6 for RGA
17:14 UTC Marc to HAM6, CER, WP 8465
17:18 UTC Jim done
17:19 UTC Jason and Timesh to end X for NCAL
17:23 UTC Charge measurements are done
17:27 UTC Karen to LVEA
17:31 UTC Timesh entering end X VEA
17:33 UTC Richard to end Y
17:39 UTC Ken into end Y VEA
17:40 UTC Jeff B. done
17:47 UTC Vanessa to LVEA
17:54 UTC Gavin back, scaffolding is removed
17:58 UTC Jeff B. moving chemicals into optics lab
17:58 UTC Gerardo back
18:00 UTC Tyler back
18:08 UTC Gerardo removing old RGA computer from LVEA
18:16 UTC Jeff B. done in optics lab
18:22 UTC Gerardo done
18:31 UTC Dave restarting CAL models
18:35 UTC Tyler using tractor to remove tumbleweeds around H2 building
18:35 UTC DAQ restart
18:40 UTC Richard back
18:52 UTC Gerardo to LVEA
19:03 UTC Jim unlocking HAM5,6 HEPI
19:06 UTC Jason back
19:07 UTC Marc done
19:23 UTC Jim done
19:24 UTC Richard and Arnaud to LVEA to look at temperature sensors
19:37 UTC Richard and Arnaud back
20:10 UTC Gerardo and Betsy back
20:15 UTC Relocking, Timesh is still at end X
20:39 UTC Filiberto and Timesh done
20:42 UTC Jeff and Hugh to end X to look at wind fence install activity
20:47 UTC Filiberto and Timesh back
21:21 UTC Jeff and Hugh back
22:12 UTC Vlad to optics lab
22:15 UTC Jason to optics lab
22:20 UTC Jason done
23:13 UTC Hugh to end X to check on wind fence install activity
23:47 UTC Timesh to end X
00:04 UTC Timesh leaving end X