CAL model and DAQ restart
Vladimir, Sudarshan, Dave:
New h1cale[x,y] models were installed, DAQ was restarted.
DAQ NDS Test Machine installed
Jonathan, Dave:
h1nds2 was installed as a test bed for new daqd code.
This new machine as added to the DAQ MEDM.
Upgrade FOM machines to Debian9
Dave:
nuc4 upgraded to nuc25 (Guardian and DRMI). This permitted the ISC Guardian overview window to resolve correctly.
nuc6 upgraded to nuc29 (ASC control and error).