Lock loss at the start of the shift. Did auto-relocking, which only need a little operator intervention with ALS-Y. Relocked and back to NLN after 2 hours of trying. (see aLOG #53222). There is heavy equipment work on the wind fence at End-X. This equipment and work will relocate to End-Y this afternoon. The wind and general environmental conditions are good. No other issues or problems noted at this time. The range is around 116.9Mpc. There is three hours commissioning work scheduled for this afternoon, between 21:00 (13:00) and 00:00 (16:00).