Reports until 16:00, Wednesday 13 November 2019
H1 General
jeffrey.bartlett@LIGO.ORG - posted 16:00, Wednesday 13 November 2019 (53226)
Ops Day Shift Summary
Ops Shift Log: 11/13/2019, Day Shift 1600 – 00:00 (08:00 - 16:00) Time - UTC (PT)
State of H1: Locked at NLN
Intent Bit: O
Support: N/A
Incoming Operator: TJ
Shift Summary: IFO lost lock in the first part of the shift. Auto recovery worked, but with a bit of operator intervention. The afternoon was given over to the commissioning team.
There was one GRB alert, which came while we were in Commissioning Mode. It was ignored.
The wind fence crew is moving from End-X to End-Y   
 
Activity Log: Time - UTC (PT)
16:00 (08:00) Take over from Corey
16:39 (08:39) Switch to EARTHQUAKE for mag5.4 from El Salvador
16:46 (08:46) Lockloss – Unknown
16:53 (08:53) Vlad – Going in and out Optics Lab
16:56 (08:56) Hugh – Going to End-X to check on wind fence installation
17:20 (09:20) Hugh – Escorting Net Services to End-Y to deliver Man Lift
                                  Net Services delivering a second Man Lift to End-X
17:35 (09:35) Karen – Going to the Wood Shop and Pump Room
17:43 (09:43) Net Services truck leaving End-Y
17:59 (09:59) Net Services Truck leaving End-X
*** Crane work at both ends all day
18:27 (10:27) Karen – Finished at Wood Shop and Pump Room
18:46 (10:46) Relocked and NLN and back into Observing
20:57 (12:57) Drop out of Observing for afternoon commissioning
20:59 (12:59) Sheila & Daniel – Going into LVEA to the Squeezer area
21:05 (13:05) Timesh, Filiberto, & Jeff K., - Going to End-X for NCal work
21:43 (13:43) Fermi GRB Alert - #E354541 latency and TD good,
                       IFO in Commissioning, LLO down - Ignored alert  
22:00 (14:00) Sheila & Daniel – Out of the LVEA
22:09 (14:09) Jeff K. – Leaving End-X
22:35 (14:35) Timesh – Back from End-X
22:47 (14:47) Rick & Suresh – Into the Optics Lab
22:48 (14:48) Gerardo – Going to Mid-X
23:37 (15:37) Hugh – Going to End-X to check on wind fence installation
00:00 (16:00) Turn over to TJ