Reports until 16:16, Friday 15 November 2019
H1 General
jeffrey.bartlett@LIGO.ORG - posted 16:16, Friday 15 November 2019 (53284)
Ops Day Shift Summary
Ops Shift Log: 11/15/2019, Day Shift 016:00 – 00:00 (08:00 - 16:00) Time - UTC (PT)
State of H1: Locked at NLN, with 105.6Mpc of range
Intent Bit: Observing
Support: N/A
Incoming Operator: Niko
Shift Summary: IFO broke lock twice during the shift mostly due to wind fence activity. It took many tries to relock from the second lockloss. The cementing of the poles for the wind fence is finished at both ends. The crews may have some more cleanup but the pole and cement work is finished.
Microseism is still high (0.6um/s) but is in a downward trend.  
 
Activity Log: Time - UTC (PT)
16:00 (08:00) Take over from Jim
17:16 (09:16) Lockloss – Possible wind fence activity at End-X
17:20 (09:20) Kyle & Chandra – Going into LVEA to change some valves of the instrument air
17:23 (09:23) Richard – Going to End-X
17:38 (09:38) Kyle & Chandra – Out of the LVEA
18:33 (10:33) Relocked and back to Observing
19:15 (11:15) Two tours of the control room
20:00 (12:00) Lock loss – High microseism and heavy trucks working on wind fence at End-X
20:09 (12:00) First cement truck on site and going to End-X
20:24 (12:24) Start pumping cement at End-X
20:35 (12:35) Second cement truck on site and going to End-X
20:55 (12:55) Third cement truck on site Going to End-X
21:15 (13:15) Mechanic truck on site going to End-X to repair contractor’s truck
21:35 (13:35) Fourth cement truck on site and going to End-X
21:43 (13:43) Timesh – Going to End-X to check on NCal stuff
21:54 (13:54) IFO relocked
21:57 (13:57) Back in Observing
22:02 (14:02) Fifth cement truck on site and going to End-Y
22:23 (14:23) Sixth cement truck on site and going to End-Y
23:48 (15:48) Last of the cement trucks going down End-Y
00:00 (16:00) Turn over to Niko