Reports until 13:01, Saturday 16 November 2019
H1 General
camilla.compton@LIGO.ORG - posted 13:01, Saturday 16 November 2019 - last comment - 14:28, Saturday 16 November 2019(53296)
H1 Lockloss
Have had a lockloss and struggling to lock again. This may be because as we have a lot of ground movement at EY from the wind fence work.
 
19:27 Lockloss. Wind fence work is ongoing at EY, with the ground being "smoothed". Imagine this is the cause.
19:31 Lockloss #2 at LOCKING_ALS
20:03 Lockloss #3 at INCREASE_POWER blame EY wind fence
20:07 Lockloss #4 at LOCKING_ALS
20:16 Lockloss #5 at OFFLOAD_DRMI_ALS
20:39 Lockloss #6 at INCREASE_POWER
20:47 Lockloss #7 at AQUIRE_DRMI_1F
Comments related to this report
sheila.dwyer@LIGO.ORG - 14:03, Saturday 16 November 2019 (53297)

One of Camilla's locklosses in this recovery (from Low noise ASC) looks pretty similar to one that's we've been having frequently where there is a sudden burst of high frequency noise in DHARD that saturates many supensions.  This one is interesting because there are several ADC saturatoins at the time of the DHARD problem, as the lockloss website shows:  1257975934.  There seems to be something wrong with the subplots that would help us narrow down which channel was saturating though. 

It also looks like inthe seconds before that lockloss we are having the problem with the PSL rotation stage where it jumps back, see 53068

camilla.compton@LIGO.ORG - 14:28, Saturday 16 November 2019 (53298)
21:14 Lockloss #8 at MAXIMUM_POWER
21:45 Lockloss #9 at LOWNOISE_ASC
22:20 NLN
22:20 Observing!