Reports until 16:07, Saturday 16 November 2019
H1 General
camilla.compton@LIGO.ORG - posted 16:07, Saturday 16 November 2019 (53299)
Shift Summary - Day

TITLE: 11/17 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Observing at 105Mpc
INCOMING OPERATOR: Niko
SHIFT SUMMARY: Work still continuing at the wind fence, mainly EY, where wires are being strung up between posts
LOG:

20:17 Ethan on site
22:53 Hugh visiting wind fence at EX then EY