TITLE: 11/18 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Observing at 113Mpc
INCOMING OPERATOR: Niko
SHIFT SUMMARY: Quiet shift with 10 minutes of Commissioning at the end due to SQZ
LOG:
16:14 Windfence crew and Hugh on site
19:15 Ethan on site
20:49 Rick and Kiyomi on site
21:39 Hugh to EX and EY
22:39 Wind fence crew and Hugh leaving
23:31 Commisioning!! Problem with SQZ_LO_LR stuck on LOCKING_OMC with message in log "Beam diverter is not open".
23:38 I call Sheila (THANKYOU!!) who remotely checked that everything looks okay so that we can open the beam diverter again.
23:44 Observing. There seemed no reason for the beam diverter to close, maybe a glitch at a similar time.