Reports until 16:14, Sunday 17 November 2019
H1 General
yannick.lecoeuche@LIGO.ORG - posted 16:14, Sunday 17 November 2019 (53309)
Ops EVE Shift Transition

Ops Shift Transition: 11/17/2019, Eve Shift 00:00–08:00 (16:00-00:00) - UTC (PT)

State of H1: Locked

Intent Bit: Observing

Weather: 0-5 mph wind

Primary 0.03 – 0.1Hz: 0.01 um/s

Secondary 0.1 – 0.3Hz: 0.4 um/s

Outgoing Operator: Camilla

Quick Summary: Locked and Observing for ~26 hours.