DAY Operator Summary

TITLE: 11/20 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Observing at 115Mpc
INCOMING OPERATOR: Ed
SHIFT SUMMARY:

H1 locked for ~16.75hrs.

Energy Committee visiting site.  Wind fence work continues; BRS has been needing to go to the Damping state today (which is concurrent with when Wind Fence work started this morning).

Little over 2hrs of Calibration time was taken on H1.

Had a couple of EQ alerts (but no action taken for either).  And ended shift with a 6.0 incoming EQ for Ed!