Activities:
- Sheila doing some CLF power adjustments in the squeezer took H1 from Observing to Commissioning a couple of times
- Timesh, coincidetntally with Sheila, went to EX to power cycle the NCAL to determine the origin of glitches tought to be caused by the new device
00:49 LOCKLOSS - 6.1 Laotian EQ
- As it seemed that the R3.5 wave had passed and thing were settling down, my urge to switch to EQ mode was quieted. The BLRMS Z axis barely touched 1um/s and the X was even less. the Y reached the 2um/s mark and perhaps that's what broke the lock?
00:50 LOCKING_ARMS_GREEN
- 00:55 ALS required intervention in ETM and TMS
- adjustments to the aforementioned not listed due to PRMI not able to be recovered by me and going to IA
- CHECK_MICH_FRINGES yielded me no positive results
01:47 INITIAL_ALIGNMENT
- Everything went rather smoothly
- Green alignment took approx 10 minutes
02:10 Attempt#1
02:52 H1 Observing
3:30 Squeezer unlocked and relocked - Intention bit Commissioning
03:31 Squeezer re-acquired lock - Intention bit Observing
Adam Mullavey called about his intention to send two Injections for stochastic and requested that I ready the INJ_TRANS Guardian Node
04:30 Verbal Alarm: Transient Injections detected
- the second is expected in two hours at 06:30UTC
04:43 Injection ended
4:44 Set SEI_CONF back to WINDY after realizing it was still set to EARTHQUAKE.
06:30 Second Transient Injection detected