DQ Shifter: Sudhagar S
Email: sudhagar.suyamprakasam@ligo.org
Fellow(s): Gavin Wallace
Link to DQ Shift: https://wiki.ligo.org/DetChar/DataQuality/DQShiftLHO20191118
* Summary
- Mean Duty Cycle (85.49% + 66.45% + 79.47% + 83.75% + 89.28% + 86.29% + 83.79% ) / 7 = 82.07%
- Mean BNS Inspiral range ~ 115 Mpc
- PCAL X is not generated on Monday
- PCAL X shown up broad band variations ~(10 Hz to 1000 Hz) on Wednesday and Thursday.
- Spectra
- ~2 K Hz line presence on Monday. It disappeared on Tuesday and Wednesday alog=53356
- Spectra is not available from Thursday on-wards.
- Air compressor noise at 36Hz persists through out the week. alog=53241
- Couple of lock loss due to the Earthquake (Wednesday and Thursday)
- Following noise frequencies shown up this week.
- ~11 Hz - Monday, Friday and Saturday
- ~64 Hz - Monday
- 42 Hz - Friday and Sunday
- H1: ETMX ESD Rack Power: More noisy on many days in a week.
- Violin modes rung up beginning of the lock state