While resetting the PSL power watchdogs, I noticed that the PMC reflected power was getting a little high, up to 11.7W. I therefore tweaked the beam alignment into the PMC; this was done with the ISS OFF. Changes summarized below:
I turned the ISS back ON, and noticed the diffracted power was below our 2% minimum (~1.4%), so I adjusted the ISS RefSignal from -2.0V to -1.99V. This brought the diffracted power back to 2%; this change was accepted in both the safe and observe SDF files.
Both PSL power watchdogs were reset at 18:00 UTC (10:00 PST). This completes FAMIS 10738.