Displaying report 1-1 of 1.
Reports until 11:31, Monday 04 February 2013
H1 SEI
greg.grabeel@LIGO.ORG - posted 11:31, Monday 04 February 2013 (5354)
HAM6 HEPI Install
The housings, crossbeams, and clamps have been installed on HAM6. It was a bit of a tight squeeze but with the help of Apollo we managed to get it done. Support tube positioning is almost complete, at which point I'll lock down the springs. One housing clamp needed a small modification, but is working well now.
Images attached to this report
Displaying report 1-1 of 1.