Reports until 00:29, Saturday 30 November 2019
H1 General
edmond.merilh@LIGO.ORG - posted 00:29, Saturday 30 November 2019 - last comment - 00:31, Saturday 30 November 2019(53582)
Shift Transition - Owl

TITLE: 11/30 Owl Shift: 08:00-16:00 UTC (00:00-08:00 PST), all times posted in UTC
STATE of H1: Observing at 114Mpc
OUTGOING OPERATOR: Patrick
CURRENT ENVIRONMENT:
    SEI_CONF state: EARTH_QUAKE
    Wind: 8mph Gusts, 5mph 5min avg
    Primary useism: 0.31 μm/s
    Secondary useism: 0.20 μm/s
QUICK SUMMARY:

Guatemalan EQ ringing down rather steeply. H1 still in EQ mode. I'll keep it that way for a bit expecting aftershocks. L1 is down.

Comments related to this report
edmond.merilh@LIGO.ORG - 00:31, Saturday 30 November 2019 (53583)

....and lockloss. I'm blaming the EQ.