08:30 Attempt #1
- X-Arm locking right away - a little feeble but WFS drove it home
- after the requisite 5 minutes, Y had to be re-aligned
- ETMY PIT from 152.3 → 151.1
- ETMY YAW from -137.1 → -136.7
-
- This was done with ndscope only as camera 05(ALSY) was down as was camera 16 (AS_AIR_
- 00:47 Dave Barker was called to rectify these issues and he instructed me on how to restart these cameras. (I'll make a seperate aLog for this and perhaps add it to the Operator Wiki for easier future reference)
08:50 Lockloss @ Acquire DRMI
08:51 attempt #2
- 09:03 Lockloss at CARM_OFFSET_REDUCTION
- This happened coincidentally with the restart of ALSY camera and Dave feels that it was due to the restart of some data that went along with the restart
09:05 Attempt #3
- 09:16 Lockloss at CARM_OFFSET_REDUCTION
- intervention protocol calls fpr IA after two of these but given that the first one may have been just a coincidence I'm going for a third try
09:19 Attempt #4
- IR not found - neither COMM nor DIFF
- 09:21 - 09:25 held at CHECK_IR and manually adjusted
- 09:34 Lockloss at CARM_OFFSET_REDUCTION
- I'm moving to IA at this point
09:37 initial alignment
- ISC_LOCK node turned bright red and there was a message that the LASER_PWR node had a notification that 'power not the same as requested' -_-
- 09:39 I restarted ISC_LOCK and this rectified the issue...jeezum
09:54 IA COMPLETE
Initial Alignment ran automatically