TITLE: 12/01 Eve Shift: 00:00-08:00 UTC (16:00-00:00 PST), all times posted in UTC STATE of H1: Lock Acquisition INCOMING OPERATOR: Ed SHIFT SUMMARY: Lock loss cause not immediately apparent. Microseism is very high and likely making relocking difficult. LOG: 01:31 UTC Dropped out of observing by squeezer 01:33 UTC Hit INIT on SQZ_MANAGER 01:34 UTC Back to observing 06:23 UTC Lock loss 06:31 UTC Green arms not locking after 5 minutes. Starting manually alignment. Moved ETMX, ETMY, TMSY 06:42 UTC Lock loss from LOCKING_ALS Microseism is quite high 06:53 UTC Script moved to locking PRMI 07:08 UTC PRMI has not locked after 15 minutes. Trying CHECK_MICH_FRINGES. 07:12 UTC Moved BS in pitch. Retrying PRMI. 07:22 UTC PRMI not staying locked. Trying CHECK_MICH_FRINGES again. Moved BS in both pitch and yaw. 07:26 UTC Retrying PRMI. 07:30 UTC Lock loss from ACQUIRE_PRMI. 07:36 UTC Stopping at CHECK_IR, blue trace found too low. Adjust COMM and DIFF offsets. 07:40 UTC Attempting to lock PRMI 07:43 UTC PRMI locked 07:50 UTC Clicked OFFLOAD_DRMI_ASC to make guardian move on, then NLN 07:51 UTC DRMI locked 07:56 UTC Lockloss from CARM_OFFSET_REDUCTION 08:00 UTC Y arm is not locking on green. Ed taking over