Ops Shift Transition: 12/02/2019, Owl Shift 08:00 – 16:00 (00:00 -08:00) - UTC (PT)
State of H1: Relocking
Intent Bit: Locking
Weather: Skies are mostly cloudy, with patches of freezing fog. The winds are Light Air. Temperatures are currently in the mid 20s with forecast lows around 20. When I came in the roads were damp with some spotty ice patches, but for the most part clear.
Primary 0.03 – 0.1Hz: 0.03um/s
Secondary 0.1 – 0.3Hz: 0.6um/s
Outgoing Operator: Patrick
Quick Summary: Patrick has been trying to relock the IFO after the earthquake in Japan. He has been having lockloss trouble at different stages of relocking. Secondary microseism is high which may be contributing to the relocking problems.