Reasonable first half of the shift. The IFO remained locked through a few earthquakes, and a Squeezer dropout. We were observing all but about half an hour while sorting out the Squeezer issue. Microseism remains elevated, but is not causing problems. Range has been floating around 115Mpc. Had one SubGRB alert, #E356318. Ignored due to high latency (12,824 seconds).