gregory.mendell@LIGO.ORG - posted 12:13, Tuesday 03 December 2019 (53650)
DMT calibration pipelines restarted during maintenance

The primary and redundant calibration pipelines producing DMT hoft were restarted around 11 am PST during maintenance after an email exchange with the calibration group, ldas, and Keita and the operator was informed. The restarts were to fix a problem with the DMT redundant hoft pipeline (it was wrting 1 s of data to disk every 3 seconds) and to reduce the latency of the DMT primary hoft pipeline (which had a latency of 17 s as measured at Caltech, and now its 9 s). The DMT calibration pipelines are both working again.