Reports until 16:07, Tuesday 10 December 2019
H1 General
edmond.merilh@LIGO.ORG - posted 16:07, Tuesday 10 December 2019 (53800)
Shift Summary

TITLE: 12/11 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Lock Acquisition
INCOMING OPERATOR: Cheryl
SHIFT SUMMARY:

Re-Locking has been both impressive (no initial alignment after a record long lock) and daunting due to some anamalous rotation stage silliness. H1 made it past the laser power increases after a coule of attempts and was paused at LOWNOISE_LENGTH_CONTROL due to a barrage of SRM saturations and gain adjustments that are currenly in the care of the commissioners. Handing of to Cheryl.
LOG:

Vendors on site:

Chris down arms for tumbleweed checks

Filiberto working at end Stations:

Jeff K and Jenne:

Niko and Dripta

Patrick

Timesh/JeffK/Evan G

Hugh and Scott

TJ and Camilla

Jim and Camilla

Chandra

Gerardo