Displaying report 1-1 of 1.
Reports until 01:38, Wednesday 11 December 2019
H1 General
cheryl.vorvick@LIGO.ORG - posted 01:38, Wednesday 11 December 2019 (53830)
OPS Eve Summary

TITLE: 12/11 Eve Shift: 00:00-08:00 UTC (16:00-00:00 PST), all times posted in UTC
STATE of H1: Corrective Maintenance
INCOMING OPERATOR: Corey
SHIFT SUMMARY: locked in Observe most of the shift, lockloss near the end of the shift, loss of light on the PSL, error message about the PMC High Voltage, and the Diode Chiller tripped off, more detailed info in other alogs by me and Corey
LOG:

H1 activities (out of Observe):

H1 activities (In Observe):

Violin Damping went well tonight, and the results are posted in my alog, alog 53827.

Displaying report 1-1 of 1.