TITLE: 12/11 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Corrective Maintenance
OUTGOING OPERATOR: Corey
CURRENT ENVIRONMENT:
SEI_CONF state: WINDY
Wind: 3mph Gusts, 2mph 5min avg
Primary useism: 0.03 μm/s
Secondary useism: 0.45 μm/s
QUICK SUMMARY:
H1 down for PSL chiller repair