21:49 PSL pre-fire check as per training email from 11/06
21:52 FE switched on and warmed-up
21:58 70W amp switched on and warmed-up
22:03 WDs reset & 70W shutter opened
22:07 PMC, FSS, & ISS re-locked & engaged
22:13 IMC locked
22:14 SEI_CONF set back to WINDY
22:17 Re-Locking!
ISS SDF DIFF was accepted