<b>TITLE:</b> 12/20 Eve Shift: 00:00-08:00 UTC (16:00-00:00 PST), all times posted in UTC
<b>STATE of H1:</b> Lock Acquisition
<b>INCOMING OPERATOR:</b> Cheryl
<b>SHIFT SUMMARY:</b> A 31 hour lock was ended by a nearby earthquake. I lost lock a few times while the DRMI ASC was trying to engage, so I decided to run an initial alignment. Made it through DRMI 2 times since then.
<b>LOG:</b>