Reports until 09:01, Friday 20 December 2019
H1 General
cheryl.vorvick@LIGO.ORG - posted 09:01, Friday 20 December 2019 - last comment - 22:40, Monday 23 December 2019(54008)
OPS Owl Summary:

TITLE: 12/20 Owl Shift: 08:00-16:00 UTC (00:00-08:00 PST), all times posted in UTC
STATE of H1: Observing at 115Mpc
INCOMING OPERATOR: Camilla
SHIFT SUMMARY: an active night for H1, in and out of Observe, currently in Observe
LOG:

Violin Current State:

Comments related to this report
cheryl.vorvick@LIGO.ORG - 22:40, Monday 23 December 2019 (54079)
There's some confusion about verbage in my alog, so to clarify, verbal alarms has only two modes, "observe" and "commissioning," and when I listed H1 in commissioning, I was refering to that distinction in verbal alarms.  For the Observatory Mode, which is is seaparate from verbal alarms, the H1 time out of Observe was Corrective Maintenance.
 
Updated log:
  • 08:53 - H1 in Observe (Intention Bit: Observing) 
  • 11:57 - H1 in commissioning - lockloss, alog 54006 (Intention Bit: Commissioning, Observatory Mode: Corrective Maintenance)
  • 13:52 - H1 in Observe (Intention Bit: Observing) 
  • 14:16 - H1 in commissioning - ITMX mode8 rung up (Intention Bit: Commissioning, Observatory Mode: Corrective Maintenance)
  • 14:43 - H1 in Observe - range at 110Mpc, and violins damping, though beginning of this stretch stil has excess violin mode noise (Intention Bit: Observing) 
  • 15:04 - H1 in commissioning - beam diverter /  SQZ, H1 out of Observe (Intention Bit: Commissioning, Observatory Mode: Corrective Maintenance)
    • this corrected itself for about 3 minutes, then 9 more cycles in about 20 minutes
  • 15:37 - H1 in Observe (Intention Bit: Observing) 
  • 15:38 - H1 in commissioning - beam diverter /  SQZ, H1 out of Observe (Intention Bit: Commissioning, Observatory Mode: Corrective Maintenance)
    • manually cycled the beam diverter, SQZ locked
  • 15:53 - H1 in Observe (Intention Bit: Observing) 
  • 15:55 - H1 in commissioning - beam diverter /  SQZ, H1 out of Observe (Intention Bit: Commissioning, Observatory Mode: Corrective Maintenance)
    • took every SQZ guardian to Down, then Init, then relock
  • 16:00 - H1 in Observe (Intention Bit: Observing)