Displaying report 1-1 of 1.
Reports until 17:32, Saturday 21 December 2019
H1 General (SQZ)
edmond.merilh@LIGO.ORG - posted 17:32, Saturday 21 December 2019 (54034)
Squeezer Dropped Intent Bit to Commissioning 01:14UTC

After watching the manager try and fail to re-lock a number of times, I took the very un-scientific approach while I looked through alogs.

01:23 H1 back to Observing

Perhaps the timing is a bit to quick for the system to stabilize for a solid locking sequence? anyone?

Displaying report 1-1 of 1.