Reports until 10:05, Thursday 26 December 2019
H1 CAL (CAL)
corey.gray@LIGO.ORG - posted 10:05, Thursday 26 December 2019 - last comment - 11:54, Thursday 26 December 2019(54125)
Sensor Calibration Measurements Run

Yesterday, I was supposed to run some normal & accepted H1 calibration measurements, but unfortunately an EQ changed my plans. 

Today I chose to run these measurements.  Before running the measurements, I wanted to minimize time out of OBSERVING as much as I could, so I got everything set up ahead of time.  I opened up (3) separate DTT sessions with each measurement ready to go (so I can easily run them and also save them while running other ones.  When starting a measurement, I turned on my Timer on my phone so I would get a reminder when it was done.

note:  Attached is a screenshot of my desktop with all three completed measurements.

H1 Status

New Measurements files:

Noticed DIAG MAIN message:

"PCAL:  PCAL Y OFS servo malfunction"  Will send a text to Jeff K.

Images attached to this report
Comments related to this report
corey.gray@LIGO.ORG - 11:54, Thursday 26 December 2019 (54127)

After I posted this alog, Jenne phoned because she noticed we didn't have some of our Cal Lines.  She said we don't want to be in OBSERVING w/o out Cal Lines, so I took us out and then we investigated PCal Y. 

We brought up the PCal-Y medm and the gray time series box eventually showed a flat line at around -8.  (this should be "fuzzy" instead....it looked like it was stuck at a value).  So we toggled the Loop Enable button (clicked OFF for 3-secs and then turned ON).  This brought back a more real (& fuzzy) signal & we were happy. 

H1 Had Cal Lines Back!

(Since we were out of Observing, this is when I started the Holiday Walk Through of VEAs.)