08:48 in the midst of high winds, high uSeism, and uncertainties with H1 pursuant to the Dolphin crash...
- Incoming EQ from Tonga 5.4
09:00 IA
- Switched SEI_CONF back to WINDY
- 09:24 I acheived a much more robust Y arm-alignment
- i had to manually change the LSC Triggring of the Upper Threshold Enable from .5 to .3 (Corey gave me this information during hand-off)
- This change corrected a severly unstable SRC alignment routine
09:49 I began to re-lock
- I didn't use the lock acquisition tracking at first because I didn't want to flood it with uncertainties surround extreme circumstances
- i manually had to manipulate at FIND_IR to finally arrive at my first DRMI attempt
- 10:13 first DRMI lock
- 10:15 multiple locklosses occurred at TURN_ON_BS_STAGE2
- I found this in aLog (TURN_ON_BS_STAGE2) but couldn't locate the channels in MEDM to verify the info contained in the log entry
- It became a non- issue
- I then began using the tracking s H1 made it through various stages of lock acquisition
At this point, uSeism is still rising and the winds are currently still gusting in the 30mph range. H1 has made it as far as DARM_TO_RF