Reports until 16:56, Thursday 07 February 2013
H1 SUS
Link
betsy.weaver@LIGO.ORG -
posted 16:56, Thursday 07 February 2013
(5422)
PR3 optic - loaded into oven
The magnetized PR3 optic was loaded into the custom ABO today for a 6 hr. ~34 degC air bake.