Reports until 10:34, Friday 03 January 2020
H1 CAL
jeffrey.kissel@LIGO.ORG - posted 10:34, Friday 03 January 2020 (54260)
Calibration Measurements: A full Suite for the New Year
J. Kissel

I've gathered a new, complete, set of calibration measurements today. This is the first complete set within the same lock stretch since 2019-12-04, given that we've either elected not to measure the actuator, or we've been plagued by earthquakes and computer problems. I intend to use this data set for the creation of a new calibration model parameter set, hopefully to be installed next Wednesday (01/08). 

Analysis to come, but here are the files:
/ligo/svncommon/CalSVN/aligocalibration/trunk/Runs/O3/H1/Measurements/FullIFOActuationTFs/
    2020-01-03_H1SUSETMX_L1_iEXC2DARM_8min.xml
    2020-01-03_H1SUSETMX_L1_PCAL2DARM_5min.xml
    2020-01-03_H1SUSETMX_L2_iEXC2DARM_12min.xml
    2020-01-03_H1SUSETMX_L2_PCAL2DARM_6min.xml
    2020-01-03_H1SUSETMX_L3_iEXC2DARM_12min.xml
    2020-01-03_H1SUSETMX_L3_PCAL2DARM_6min.xml

/ligo/svncommon/CalSVN/aligocalibration/trunk/Runs/O3/H1/Measurements/FullIFOSensingTFs/
    2020-01-03_H1_DARM_OLGTF_LF_SS_5to1100Hz_15min.xml
    2020-01-03_H1_PCALY2DARMTF_BB_3min.xml
    2020-01-03_H1_PCALY2DARMTF_LF_SS_5t1100Hz_10min.xml