Reports until 00:08, Tuesday 07 January 2020
H1 General
jim.warner@LIGO.ORG - posted 00:08, Tuesday 07 January 2020 (54324)
Shift Summary

TITLE: 01/07 Eve Shift: 00:00-08:00 UTC (16:00-00:00 PST), all times posted in UTC
STATE of H1: Lock Acquisition
INCOMING OPERATOR: Camilla
SHIFT SUMMARY: Bad environment
LOG:
Niko had a hard time with the wind, I made progress and got locked turning of the arm CPS differential,  but then a 50 mph gust broke lock. Haven't locked since then because as the wind came down and Malayasian earthquake came in and made locking difficult.