Dust monitor 4 in the beam splitter test stand clean room was of interest today because of drilling for cable trays along the Y beam manifold. Signals from this monitor were quiet throughout the drilling, with only occasional 3um counts of 10 or 20. There have been several higher count episodes (100-200) over the last 1.5 hr while someone has been working on the suspension.