Locking:
Recovered after maintenance day. I ran an initial alignment right away because of wind, earthquakes, and my testing of green locking automation moving the TMS. During initial alignment, Sheila loaded in a change from Jan. 2 (alog54240) for the triggering in SRY locking. This change allowed us to lock SRC. After initial alignment, there was no operator intervention in the locking.
SDFs
The fume hood in the optics lab was on until 2245 UTC. This may have been a noise source for the first ~30min of observation.