TITLE: 01/12 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Aligning
INCOMING OPERATOR: Cheryl
SHIFT SUMMARY:
Bumpy shift.
- Wind trended downward for the first half and then back upwards for the latter half resulting in a lockloss
- 23:36 Initial alignment after a failed attempt at PRMI
- three tour groups in during my shift
- Handing off freshly aligned H1 to Cheryl for re-locking
LOG: