H1 General
jeffrey.bartlett@LIGO.ORG - posted 16:22, Tuesday 14 January 2020 (54510)
Ops Day Shift Summary
Ops Shift Log: 01/14/2020, Day Shift 16:00 – 00:00 (08:00 - 16:00) Time - UTC (PT)
State of H1: Locked at NLN, Range is 116.0Mpc
Intent Bit: Observing
Support: Jenne, Sheila, Rahul
Incoming Operator: Niko
Shift Summary: Relocking after the maintenance window had problems with Y-Arm ALS. Could not get any power buildup. Jenne moved the ETM-Y almost 20ur in pitch to get any flashing. Got the power up to 0.2 and tried INCREASE_FLASHES. This stalled again, so tweaked ETM-Y again. Got the power up to 0.4 and tried INCREASE_FLASHES. This stalled again. Tweaked ETM-Y and got the power up to 0.6. Tried the automation again and had no increase in power. Hand tweaked the power up to 0.8 and waited for the Guardian and WFS to build the power up the rest of the way. There was no improvement in power so I bumped ETM-Y by 0.03, at which point the WFS took the power up to over 1.0 and ALS locked.
A couple things went wrong. First, I had the ALS Guardian log open, sitting on top of the ISC_LOCK Guardian and I did not see the Find Y-Arm by Hand message. Secondly, I did not know that after two tries the INCREASE_FLASHES process stopped.
 
The ETM-Y Violin Mode #20 was rung up to 4.43. Worked with Rahul to damp the mode. Tried moving the gain from 0.5 to 1.0, which increased the ring up. Set the gain to 0.0 and the mode started to come down. It is currently back down to 4.43 and slowly dropping.   
 
Activity Log: Time - UTC (PT)
16:00 (08:00) Take over from Corey
16:00 (08:00) Karen & Vanessa – Into the LVEA for cleaning
16:01 (08:01) Jeff K. – Reconciling SAFE.SNAP
16:05 (08:05) Ed – Working on PUM noise fix
16:05 (08:05) Hugh – Going to HAM7/8
16:30 (08:30) Filiberto – In LVEA cabling around PSL rack
16:45 (08:45) Gerardo – Going into LVEA to trace some pipes
16:45 (08:45) Chandra – Going into the LVEA to work on turbo pumps
16:47 (08:47) Robert – Going to End-Y to check on magnetometer & setup for movies
16:59 (08:59) Kyle – Going to End-Y to make measurements and lay some cables
17:03 (09:03) Jason, Camilla, Karen, & Vanessa – Into PSL enclosure for cleaning and plumbing checks
17:16 (09:16) Robert – Finished at End-Y
17:16 (09:16) Robert – In LVEA to check magnetometer
17:37 (09:37) Bubba – Taking Desert Green over the X-Arm overpass
17:42 (09:42) Robert – Finished in LVEA
17:51 (09:51) Chandra – Out of the LVEA
18:00 (10:00) Dave – Update to SUS ETM-X and ETM-Y Models & DAQ restart
18:03 (10:03) Paradise Water on site
18:03 (10:03) Gerardo – Going to Mid-Y to look at pump installation
18:08 (10:08) Christina – Going into the LVEA for inventory work
18:09 (10:09) Norco on site for N2 delivery to CP7
18:14 (10:14) Ed – Finished with PUM upgrades
18:35 (10:35) Jason & Camilla – Out of the PSL Enclosure
18:39 (10:39) Karen – Going to End-Y
19:00 (11:00) Gerardo – Back from Mid-Y
19:12 (11:12) Hugh – Finished in the LVEA
19:18 (11:18) Ed & Camilla – Doing sweep of LVEA
19:29 (11:29) Dave – Restarting digital video server to fix camera #18
19:30 (11:30) Start relocking after maintenance
19:35 (11:35) Ed & Camilla – Finished with LVEA sweep
19:44 (11:44) Karen – Out of End-Y
19:44 (11:44) Kyle – Out of End-Y
20:56 (12:56) Filiberto – Going to Mid-Y to recover parts
21:29 (13:29) Filiberto – Back from Mid-Y
21:58 (13:58) Locked at NLN
22:01 (14:01) Clear SDF Diffs and back into Observing
22:10 (14:10) Richard – Going into CER to look at network switch – Approved by Betsy
22:12 (14:22) Richard – Out of the CER
00:00 (16:00) Turn over to Niko