Reports until 16:10, Monday 11 February 2013
LHO General
justin.bergman@LIGO.ORG - posted 16:10, Monday 11 February 2013 (5456)
Ops Summary
LVEA laser safe all day.

Ongoing H1 PSL enclosure environmental alarms all day relating to Robert Schofield's aLog entry from Sunday. Recall that HEPA and AC units are offline in the enclosure. Low differential pressure (LVEA<->PSL anteroom 0.00 inchesH20) and periodic high dust counts (briefly approached 1000 cts for 0.3 microns in the anteroom this morning, now at zero. No dust data for the laser room.)

0845-1000 - Paul F taking power spectra on IMC.
0845 - Doug D D working near H2 enclosure.
0900 - Corey G working around HAM6/Squeezer bay.
0910 - HFD onsite working on fire alarm systems in OSB and LSB, users should receive additional notification before alarms activated.
0930-1530 - Eric A and Chris (Apollo) in LVEA inspecting and working on valving and piping for HEPI systems. (HAM4/6 and BSC3).
1000-1500 - Gregorio to Pasco.
1000 - Apollo moving ERGO arm over beam tube to South Bay.
1030 - Filiberto running cables HAM1-HAM3.
1030 - Patrick and Justin reset remote dust alarm threshold for DST_16 to 1000cts (local alarm threshold unchanged).
1300 - First cleaning of HAM3-BSC2 spool. Justin to LVEA to investigate 80,000 ct (.3) dust alarm at DST_15. Vacuum cleaner had been running next to monitor.
1345 - Corey G to EY.
1430 - Keita pulling a length diode on IOT2L (H1 PSL shutter is closed). 
1545 - Justin reset remote alarm threshold for DST_16 to default values (minor>100, major>200).