TITLE: 01/19 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Observing at 121Mpc
INCOMING OPERATOR: Patrick
SHIFT SUMMARY: Locked 26h 30. Microseism still high.
LOG:
16:08-16:11 with Jim, tried changing SEI_DIFF from CORNER_DIFF_CPS to DOWN to reduce glitches, this didn't seem to help, maybe looked worse, so reverted to CORNER_DIFF_CPS
16:15 Scott, Chris and Tyler out to MX to work on tumbleweeds.
20:45 Tyler, Chris, Scott have finished with tumbleweeding for the day!