Times in PST: 0950 - Power is out. Started later than scheduled because Benton PUD received a delivery later than scheduled. 1005 - Power is back, no internet 1007 - Starting workstations in the control room. control0 is trying to connect to granite, even though we wanted it to do otherwise. control3 should have been on UPS, but the old Sun machine was on the UPS instead. 1015 - Email/Phones back 1024 - Wrote a frame level 1645 yesterday -> 1024 today: data lost 1047 - Richard fixes access system on ISCT1 and ISCT3 1108 - h1susepics starting 1302 - Diamond Freight arrives 1450 - Oscar done baling tumbleweeds CDS Summary: All H1 systems are back except for AWG and FMCS. FMCS is being worked on right now. AWG is not responding well. Dani and Richard investigated the access system including reproducing the door-bouncing at the LVEA entrance. Notice to all: Unless there is an emergency, do not exit the LVEA by pulling the door open before the system has read your card. We recommend that you just pull on the big handle above the door handle. If your card has not been read the door will not open, which will give you a chance to retrace your steps, saving us all from time-expensive door alarm investigations.