Reports until 16:10, Friday 24 January 2020
H1 General
jeffrey.bartlett@LIGO.ORG - posted 16:10, Friday 24 January 2020 (54710)
Ops Evening Shift Transition
Ops Shift Transition: 01/24/2020, Evening Shift 00:00 – 08:00 (16:00 -00:00) - UTC (PT)
State of H1: Relocking
Intent Bit: Locking
Weather:  Skies are partly cloudy. There is a chance for more rain this evening. Winds are blowing up 25mph. The temperatures are currently in the mid to lower 50s         
Primary 0.03 – 0.1Hz: 0.04um/s
Secondary 0.1 – 0.3Hz: 0.3um/s
Outgoing Operator: Corey
Quick Summary: The IFO is being relocked after struggling against elevated winds and increasing microseism.