Reports until 00:29, Saturday 25 January 2020
H1 General
yannick.lecoeuche@LIGO.ORG - posted 00:29, Saturday 25 January 2020 (54716)
Ops OWL Shift Transition

Ops Shift Transition: 01/25/2020, Owl Shift 08:00–16:00 (00:00-08:00) - UTC (PT)

State of H1: Locked

Intent Bit: Observing

Weather: 0-10 mph wind

Primary 0.03 – 0.1Hz: 0.01 um/s

Secondary 0.1 – 0.3Hz: 0.4 um/s

Outgoing Operator: Jeff

Quick Summary: Locked and Observing for 8 hours. Wind has been on the decline since hitting 50 mph earlier today