Reports until 15:05, Tuesday 12 February 2013
LHO General
bubba.gateley@LIGO.ORG - posted 15:05, Tuesday 12 February 2013 (5474)
Apollo crew
We removed the east door on ham 3 and then removed the blank on the septum. The door was then replaced on the ham with 4 bolts. All but 4 bolts on the BE-3A spool have been removed and those remaining 4 were backed off 1 turn in preperation for removal of septum and spool tomorrow.