Displaying report 1-1 of 1.
Reports until 18:51, Tuesday 12 February 2013
LHO General
patrick.thomas@LIGO.ORG - posted 18:51, Tuesday 12 February 2013 (5475)
Ops summary
HAM 2,3 volume was done venting this morning
Apollo removed the east door on HAM 3 and the blank on the septum
Filiberto and Vincent changed the connections of the ISI and HEPI cables to the BSC 1 expansion chassis to conform with the drawings for ADC and DAC usage
Richard to end Y to work on access control system
Filiberto moved satellite boxes for BSC1 to newly installed rack
Mark B. started running transfer functions on PR3
Fire department was on site testing alarms
Eric installed valves in the HEPI hydraulic lines
Jim working on BS in test stand in the afternoon
Rick went into the H1 PSL enclosure to investigate temperature fluctuations, turned out to be normal
CDS maintenance work
Displaying report 1-1 of 1.