HAM 2,3 volume was done venting this morning Apollo removed the east door on HAM 3 and the blank on the septum Filiberto and Vincent changed the connections of the ISI and HEPI cables to the BSC 1 expansion chassis to conform with the drawings for ADC and DAC usage Richard to end Y to work on access control system Filiberto moved satellite boxes for BSC1 to newly installed rack Mark B. started running transfer functions on PR3 Fire department was on site testing alarms Eric installed valves in the HEPI hydraulic lines Jim working on BS in test stand in the afternoon Rick went into the H1 PSL enclosure to investigate temperature fluctuations, turned out to be normal CDS maintenance work