Ops Shift Log: 01/26/2020, Evening Shift 00:00 – 08:00 (16:00 - 00:00) Time - UTC (PT)
State of H1: Relocking
Intent Bit: Locking
Support: N/A
Incoming Operator: Corey
Shift Summary: IFO broke lock at 03:39 (19:39) with an I_Y message on Verbal_Alarms. Problems again with DRMI-1F and PRMI. Put a halt to locking, for the passage of a mag6.3 EQ from the Solomons. After EQ passed, back into WINDY and ran Initial Alignment, which completed with a tweak to ETM-Y and TMS-Y in pitch and yaw.
Tried relocking. Made it to LOWNOISE_ASC when lock broke. This attempt was the second time this evening the locking process made it past DRMI_1F. It was also the second time the lock broke at LOWNOISE_ASC.
Trying to lock again. Still not making it past DRMI_1F. Turning over to Corey. Perhaps he will have better success.
Activity Log: Time - UTC (PT)
00:00 (16:00) Take over from Patrick
03:39 (19:39) Lock loss – I_Y message at lock loss
03:40 (19:40) Start relocking
05:08 (21:08) Abandon locking and Initial Alignment due to incoming EQ from the Solomons
06:45 (22:45) Back to WINDY
06:45 (22:45) Start Initial Alignment
07:05 (23:05) Finished Initial Alignment
07:06 (23:06) Start relocking
07:38 (23:08) Lock loss at LOWNOISE_ASC
07:40 (23:40) Try locking again
08:00 (00:00) Turn over to Corey