TITLE: 01/28 Owl Shift: 08:00-16:00 UTC (00:00-08:00 PST), all times posted in UTC
STATE of H1: Observing at 117Mpc
INCOMING OPERATOR: Jim
SHIFT SUMMARY:
Mostly uneventful night except for a random lockloss, which took the usual 1.5hrs to recover from.
Time to get our Maintenance Day on!
LOG:
- 12:47 Sudden lockloss in very quiet environmental conditions.
- Lockloss Tool Notes:
- ETMx L1 glitches 0.1sec before lockloss
- Several ASC Control Signals (Arm) HARD/SOFT signals glitch about 0.1sec before lockloss
- 1-5th locklosses were all over the place! (beginning to think H1 really just needs the time to humor us and cool down before it's ready to lock again)
- 13:43-14:18 (6th attempt) Back to NLN & seconds later OBSERVING.
- 13:30 - 14:12 Noticed some small EQ activity, but nothing on SEISMON or USGS.
- 14:40-15:15 Electronics work (for roughing pump) in Mechanical Room (Ken)
- 15:24 Checking tumbleweed situation on X-arm (Chris, Scott)
- 15:46- 15:57 PEM Injection successfully run.
- 15:57 OBSERVATORY MODE: PREVENTATIVE MAINTENANCE