Reports until 15:43, Thursday 30 January 2020
H1 AOS
sheila.dwyer@LIGO.ORG - posted 15:43, Thursday 30 January 2020 (54822)
SQZ green power increased

After having trouble earlier (54819), we were able to scan the squeezer with 13.7mW of injected green power.  I will make plots with the correlated noise subtracted and post them when ready.  

Earlier in this lock our range was ~116Mpc, but we saw during the scan that for CLF demod angles aroun 105degrees we could get 120 Mpc.  We have left the injected power at 13.7mW and the demod angle at 105 to get a few extra Mpc. 

Images attached to this report