Reports until 08:08, Sunday 02 February 2020
H1 General
yannick.lecoeuche@LIGO.ORG - posted 08:08, Sunday 02 February 2020 (54854)
Ops Day Shift Transition

Ops Shift Transition: 02/02/2020, Day Shift 16:00–00:00 (08:00-16:00) - UTC (PT)

State of H1: Locked

Intent Bit: Observing

Weather: 0-10 mph wind

Primary 0.03 – 0.1Hz: 0.01 um/s

Secondary 0.1 – 0.3Hz: 0.3 um/s

Outgoing Operator: Ed

Quick Summary: Locked for 27 hours. Range seems to have dropped gradually over the last four hours, not sure as to why (118->108 Mpc, no significant increase in wind or microseism from the last 12 hours).