We removed the septum between ham 3 and bsc 2, wraped in aluminum foil and ameristat, laid on a pallet. The bellows portion of the spool BE-3A was also removed and hard (aluminum) covers installed on both ends of said spool, and placed on a pallet. A aluminum cover was also installed on the rigid portion of BE-3A which is still connected to bsc 2. This spool will be removed tomorrow.