Ops Shift Transition: 02/03/2020, Day Shift 16:00–00:00 (08:00-16:00) - UTC (PT)
State of H1: Locked
Intent Bit: Observing
Weather: 0-10 mph wind
Primary 0.03 – 0.1Hz: 0.01 um/s
Secondary 0.1 – 0.3Hz: 0.3 um/s
Outgoing Operator: Jeff
Quick Summary: Locked for 51 hours, steady wind and microseism. X arm in the process of being cleared.